BEKOTEC-THERM at Linnenbecker in Hanover

Category: Commercial premises | Location: Hanover, Germany | Products used: BEKOTEC-THERM

Internal view of the Wilhelm Linnenbecker GmbH & Co. KG branch office in Hanover.

Ausstellung wird zum „Vorführmodell“

Pleasant indoor climate in the new showroom: At its Hanover branch, Wilhelm Linnenbecker GmbH & Co. KG has integrated the Schlüter-BEKOTEC-THERM ceramic thermal comfort floor into the showroom area, covering around 500 m2, in the course of a new construction. As part of the system, the uncoupling membrane Schlüter-DITRA 25 (now called DITRA) ensures reliable waterproofing and heat distribution under the tiling.

Note: This project is intended as an architectural reference. The content does not include any general statements on the environmental impact of the products used.

External view of the building of the new Linnenbecker branch office in Hanover © Linnenbecker Hannover

The new Linnenbecker branch office in Hanover.

View of the reception area with studded panels and heating pipes installed © Schlueter-Systems

The design structure is characterised by its low assembly height and high load-bearing capacity.

BEKOTEC studded panel with heating pipes installed © Schlueter-Systems

The heating pipes of BEKOTEC-THERM are installed in the studded panel.

Screed has already been applied to some of the installed studded panels © Schlueter-Systems

The screed that is then laid simply needs a minimum screed coverage of 8 mm.

Tilers start installing the tiles on Schlüter-DITRA 25 © pro3haus

Thanks to Schlüter-DITRA 25 bonded uncoupling, tile installation can begin immediately when the screed is ready for foot traffic. It also ensures particularly uniform heat distribution.

Schlüter-DITRA 25 uncoupled area with Aventuro tiles from Linnenbecker installed. © pro3haus

In Hanover, Aventuro tiles from Linnenbecker were laid in a 60 x 60 cm format.

zoom_out_map search
External view of the building of the new Linnenbecker branch office in Hanover
View of the reception area with studded panels and heating pipes installed
BEKOTEC studded panel with heating pipes installed
Screed has already been applied to some of the installed studded panels
Tilers start installing the tiles on Schlüter-DITRA 25
Schlüter-DITRA 25 uncoupled area with Aventuro tiles from Linnenbecker installed.

Andreas Wiemers, Sales Manager Tiles at Linnenbecker, is very satisfied with the new construction: "We have become very familiar with ceramic thermal comfort flooring, and not just since the integration of the BEKOTEC CompetenceCentre into our Dortmund and Münster showrooms. As a longstanding partner of Schlüter-Systems, we therefore decided in favour of this floor heating system for our new building in Hanover. The quick and easy installation was, naturally, just as much of an advantage for us as the high durability of the floor structure. Now we can show our customers the benefits of BEKOTEC-THERM in a very clear and real way in our own showroom."