The tiles adjoining the profile must be chamfered by 45°.
When creating 3 way external corners, always start by inserting the pre-fabricated parts of the corner set into the tile adhesive so that the whole surface is covered. The following work sequence should be observed:
- Left corner piece (1 trapezoid perforation),
- Right corner piece (2 trapezoid perforations),
- Lower corner piece (3 trapezoid perforations),
- Next, cut the profiles to the required lengths and work them into position.